RPC Monitor Page
This is a display of the RPC current drawn by each High Voltage channel. The timeline is 48 hours and the beginning and ending dates are listed on the bottom of each page. The red lines represent the maximum value of the current drawn in a one minute time slice, the blue lines represent the minimum value drawn during the same minute. The gaps where the red is slightly below the blue are times when the HV monitoring process was not logging data.
General
RPC trouble shooting page
Reload