Mecca/Pass1
Readiness
Checklist

  

Current Mecca Status: We are going to make a Pass1_3 release before Christmas. We will begin full Pass1 reconstruction with this release and will begin putting the entire Mecca framework in place. It is anticipated that the data processed with Pass1_3 will be reprocessed if major improvements are made to the code.

Pass1_4 is targeted for February 11. The libraries will be frozen on that date.

Package Description of Task
Critical for Pass1_4   Desired for Pass1_4
Unknown or critical for skims   Done
Responsible
People
Status Target
Date
General Verify every analysis can be
redone using the PASS1 output
Everyone ?? ??
GeometryNew bend centers and kicks Erik Done ??
GeometryStudy FFA problem Illinois ?? ??
GeometrySSD Yaw correction Erik ?? ??
GeometryRun periods I && III ?? ?? ??
CerenkovCitadl track criteria Jim ?? ??
CerenkovAssumed photoelectron values Jim ?? ??
CerenkovNew ODDPACK histograms Jim ?? ??
OE Reconstructed output block Stephano ?? ??
OE Release 1 or 2? Stephano
Alberto
?? ??
IE Finalize geometry Eric $RLIB ??
IE New IEC block Eric ?? ??
IE Improve shower recognition Brian
John C.
?? ??
HC Neutral Hadron Skims Germano Done ??
HC HC reconstruction changes Germano Done ??
Target SiRelease new code (DCL) Done ?? ??
SEZDEE SEZLST overflow/Output blockPaul ?? ??
SEZDEE Subskim flags Paul ?? ??
SEZDEE Add more modes Paul ?? ??
SEZDEE Revisit double-D cuts Paul ?? ??
SEZDEE Modify DEEPAK Paul ?? ??
SEZDEE Skim for new modes on 2nd passPaul ?? ??
SEZDEE Secondary VTX refit Paul ?? ??
SEZDEE D* modes Paul ?? ??
SEZDEE DVTARC vs. MAT_CUT Eric ?? ??
Muons QTRACEM2 bug fix Angel Done 31-Dec
Skims New CITADL cut points Many Done ??
Skims CITADL for kinks Gianluigi Done ??
DST Include straw variables Matt
Jon
?? ??
DST Beam tagging info Matt
Peter
?? ??
DST Target silicon variables Matt
Will
$DLIB ??
DST EM calorimetry variables Matt
CU
Almost ??
DST Muon isolation variables Matt
UPR
Done ??